Skip to content

Chat Index

Date Name Summary Tags
2026-03-27 building-context-skill Built the context-manager skill for persistent memory across Claude conversations skill-creator, productivity, meta
2026-03-27 triangulator-skill-build Built the LLM triangulator skill — 7 providers, model registry, auto-refresh, balance monitoring, smart UX flow llm-triangulator, skill-building, api-setup, model-registry, architecture
2026-03-27 context-manager-infrastructure Built full infrastructure: Dreamhost backups, knowledge base synthesis, MkDocs website at context.rootphi.net with password protection, deploy/reset scripts, disaster recovery guide context-manager, infrastructure, dreamhost, mkdocs, backup, knowledge-base, website, deployment
2026-03-27 api-key-rotation Rotated OpenAI and Google API keys (secure clipboard workflow), repackaged triangulator skill, rewrote CLAUDE.md with session lifecycle instructions, ran workspace health check api-keys, security, key-rotation, llm-triangulator, skill-repackaging, claude-md, workspace-health
2026-03-27 creativeos-architecture-triangulation Built n8n webhook workflow for LLM triangulation (bypassing Cowork sandbox), ran 4 CreativeOS architecture questions across 7 providers (32 API calls), synthesized consensus architecture. Upgraded Google to paid Gemini 2.5 Pro. Added clarifying question round to triangulator skill. Decided: Postgres+Supabase+Vercel+Cloudflare+Next.js+tldraw+LangGraph+n8n stack, modular monolith pattern, "first tenant" productization model creativeos, architecture, triangulation, n8n, llm-triangulator, supabase, postgres, nextjs, tldraw
2026-03-27 context-manager-autosave-upgrade Added dual-trigger auto-save (content-based + cadence-based) and manual checkpoint to context-manager skill. Packaged and validated. context-manager, skill-upgrade, auto-save, checkpoint, infrastructure
2026-03-28 creativeos-phase1-spec Wrote Phase 1 technical spec (Foundation, Weeks 1–4): 5-table schema with RLS, API routes, Next.js scaffold, auth flow, acceptance criteria, weekly build plan. Verified against synthesis. Created GitHub repo (bwitlin/creativeos). Provisioned Supabase (Rootphi org, creativeos project, Micro, US West Oregon). Captured API keys securely. All infrastructure ready for Week 1 build. creativeos, phase1-spec, github, supabase, architecture, infrastructure