| 2026-03-27 |
building-context-skill |
Built the context-manager skill for persistent memory across Claude conversations |
skill-creator, productivity, meta |
| 2026-03-27 |
triangulator-skill-build |
Built the LLM triangulator skill — 7 providers, model registry, auto-refresh, balance monitoring, smart UX flow |
llm-triangulator, skill-building, api-setup, model-registry, architecture |
| 2026-03-27 |
context-manager-infrastructure |
Built full infrastructure: Dreamhost backups, knowledge base synthesis, MkDocs website at context.rootphi.net with password protection, deploy/reset scripts, disaster recovery guide |
context-manager, infrastructure, dreamhost, mkdocs, backup, knowledge-base, website, deployment |
| 2026-03-27 |
api-key-rotation |
Rotated OpenAI and Google API keys (secure clipboard workflow), repackaged triangulator skill, rewrote CLAUDE.md with session lifecycle instructions, ran workspace health check |
api-keys, security, key-rotation, llm-triangulator, skill-repackaging, claude-md, workspace-health |
| 2026-03-27 |
creativeos-architecture-triangulation |
Built n8n webhook workflow for LLM triangulation (bypassing Cowork sandbox), ran 4 CreativeOS architecture questions across 7 providers (32 API calls), synthesized consensus architecture. Upgraded Google to paid Gemini 2.5 Pro. Added clarifying question round to triangulator skill. Decided: Postgres+Supabase+Vercel+Cloudflare+Next.js+tldraw+LangGraph+n8n stack, modular monolith pattern, "first tenant" productization model |
creativeos, architecture, triangulation, n8n, llm-triangulator, supabase, postgres, nextjs, tldraw |
| 2026-03-27 |
context-manager-autosave-upgrade |
Added dual-trigger auto-save (content-based + cadence-based) and manual checkpoint to context-manager skill. Packaged and validated. |
context-manager, skill-upgrade, auto-save, checkpoint, infrastructure |
| 2026-03-28 |
creativeos-phase1-spec |
Wrote Phase 1 technical spec (Foundation, Weeks 1–4): 5-table schema with RLS, API routes, Next.js scaffold, auth flow, acceptance criteria, weekly build plan. Verified against synthesis. Created GitHub repo (bwitlin/creativeos). Provisioned Supabase (Rootphi org, creativeos project, Micro, US West Oregon). Captured API keys securely. All infrastructure ready for Week 1 build. |
creativeos, phase1-spec, github, supabase, architecture, infrastructure |